Renovation of a commercial unit in Sarrià-Sant Gervasi, Barcelona
Carrer de Muntaner, Barcelona · 80 m² · 2026

Project details
- Floor area
- 80 m²
- Property type
- Commercial unit
- Duration
- 3 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 12,000–13,000 €
- What we did
- Insulated plasterboard partitions · Internal windows · Classroom and reception · Two-tone paint · LED lighting
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Reorganising a working unit with insulated plasterboard and internal windows: a training classroom, reception and office, worked on without closing the business.
The unit had been running for years and needed to separate its three uses for real: receiving, teaching and working in an office. Plasterboard partitions with rock wool were built — the class and the conversation at reception cannot be mixed — and internal windows were opened in them so the unit would not lose the light from the façade.
The classroom was fitted with linear LED lighting, a projector and whiteboards, and the simulator area was left to itself, where it gets in nobody’s way. Everything was painted two-tone, white above and grey up to mid-height, which stands up to chairs and rucksacks rubbing without asking for a repaint every year.
The hardest part does not show in the photos: the business did not close. Work went in phases, with furniture and equipment covered in plastic every afternoon, and every Monday the unit opened with one more wall.
We renovate commercial units in phases and without closing the business, in Sarrià-Sant Gervasi and across Barcelona. If your unit needs a reorganisation like this, let us talk before the till stops.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.





















