Completed

Slatted ceilings and compact cloakrooms in Santa Perpètua de Mogoda

Carrer de Pere II el Gran, Santa Perpètua de Mogoda · 3 m² · 2026

Finished slatted ceiling, with recessed spotlights aligned with the module

Project details

Floor area
3 m²
Property type
Flat
Duration
1 weeks
Year
2026
Status
Completed
Budget
5,300 €
What we did
Removable slatted ceiling · Recessed spotlights aligned with the module · Integrated ventilation grille · Glass-block wall in a shower cubicle

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Removable slatted ceilings in narrow bathrooms, with the spotlights and the grille aligned to the module instead of spread by eye.

A slatted ceiling is the sensible solution for a bathroom with services overhead: it is removable, so a leak or a repair does not mean breaking anything, and it tolerates damp better than a board.

What makes it look well fitted or cheap is the module. The slats have a fixed width, and if the ceiling is not set out so that the first and the last are equal, the bathroom ends up with a whole slat on one side and a three-centimetre strip on the other. The width is measured, divided and cut equally on both sides.

The spotlights and the grille are placed on a slat, centred in its width, not straddling two. It is the detail that brings order to the whole ceiling.

Removable ceilings in Santa Perpètua de Mogoda, fitted in narrow bathrooms and compact cloakrooms.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →