Completed

Bespoke furniture and painting of a living room in Poblenou, Barcelona

Carrer de Pujades, Barcelona · 24 m² · 2026

The living room with the walls repaired and the floor protected, before the unit

Project details

Floor area
24 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
Completed
Budget
34,000–40,000 €
What we did
Bespoke joinery · Wall-to-wall bookcase · White lacquer · LED lighting · Painting of the living room

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A wall-to-wall bookcase made to measure for the living room: from the pencil plan to the MDF carcase, and from there to the white lacquer with LED lighting and a sliding panel for the TV.

This commission began the way good ones do: with a pencil plan on squared paper, dimensions included. The client wanted a wall-to-wall bookcase in the living room that would swallow books, display cabinets and the TV without looking like furniture bought in pieces.

The carcase was made in MDF to the exact size of the wall panel, with drawers and doors below and the TV recess solved with a sliding panel: closed, it is a clean wall; open, it is the living room as ever. Then came the slow part — filling, sanding and lacquering in white — and the installation of the LED strip on every shelf, which gives the unit that shop-window glow at night.

While at it, the whole living room was painted, as it had been marked up when the walls were chipped back. The result holds a full encyclopaedia and still looks light.

If you are looking for bespoke joinery in Poblenou or anywhere in Barcelona — a bookcase, a walk-in wardrobe, a piece that makes use of that impossible corner — this living room is our calling card.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →