Completed

Gallery with a black hexagonal floor in Nou Barris, Barcelona

Passeig de Fabra i Puig, Barcelona · 5 m² · 2026

Gallery with the black hexagonal floor finished and the window joinery still protected

Project details

Floor area
5 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
Completed
Budget
1,700 €
What we did
Large-format hexagonal flooring · Setting out from the centre line to spread the cuts · Laying with a wedge levelling system · Parapet tiled in a wood effect

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

The floor of a gallery done in large-format black hexagons, set out from the centre line so the cut pieces fall against the wall and not against the windows.

A gallery is the worst possible room for a hexagonal floor: it is long, narrow and has a whole wall of windows that lights the floor from the side. Any deviation in the setting-out shows along the full length of the passage.

That is why the hexagon is set out from the centre line and not from a corner. The central line of the gallery is marked, laying goes from there towards both sides, and the cut pieces end up against the blind wall, where the skirting covers them. Against the windows there is whole tile, which is what you see.

The hexagon also has three joint directions instead of two, so everything is laid with levelling clips: the slightest lip between two pieces, with the light coming in raking from the large windows, turns into a visible shadow.

Ceramic floors in Nou Barris, set out before the first bag was opened.