In progress

Strip-out of a flat in an old building in Manresa

Carrer del Born, Manresa · 75 m² · 2026

The room stripped back to the brick with the joisted ceiling

Project details

Floor area
75 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
In progress
Budget
3,000–3,300 €
What we did
Demolition of partitions · Removal of false ceilings and wall linings · Timber joists and brick vaulting left exposed · Walls cleaned back to the brick · Debris clearance and waste removal

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

The flat taken back to an open shell: full demolition and clearance down to the exposed timber joists and the brickwork of the building.

There is a moment in every renovation of an old building when the flat shows what it is: this is it. Full demolition and clearance — partitions, false ceilings, wall linings — down to the honest structure: timber joists, brick walls and the original balconies letting light in from side to side.

It is the least photogenic stage and the most important: this is where it is decided where the new services will run, which beam needs some care and what layout the space deserves. The skip in the street and the dust on the boots do not make the magazines, but without them there is no after.

This job in Manresa is in full swing: when the flat is finished, these photos will be the “before” to be proud of.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.