Flat renovation with oak parquet and three bathrooms

2026

Bedroom with oak parquet and a radiator under the window

Project details

Property type
Flat
Year
2026
Status
Completed
What we did
Oak parquet · Three complete bathrooms · Boiler and radiator heating · Utility room · Sliding steel-and-glass door

About this renovation

A recently built flat finished to measure: oak parquet, three distinct bathrooms — one in sage-green herringbone — and new heating with vertical radiators.

Recently built flats come with the structure settled and the views a given; what they usually need is a finish to match. In this one oak parquet went into every room, with black joinery on the large windows and vertical radiators that do not take up useful wall.

The three bathrooms each go their own way: one with sage-green herringbone tile in the shower, light-grey porcelain and a countertop basin on a wooden unit; another in beige tones with a bath and a screen; and a third with wood-effect porcelain and a green unit.

The heating is new from start to finish: a wall-hung boiler, manifolds with pumps and radiators in every room. It was rounded off with a utility room with a washer and dryer stacked in a column, and a sliding steel-and-glass door to the bathroom.

A flat renovation simple in concept and careful in execution: few decisions, but all well made.