Renovations · Costa Brava

Renovation company on the Costa Brava: houses, villas and apartments from Blanes to Portbou

We renovate second homes along Girona’s whole coast: detached houses and villas on the cliff, apartments facing the sea and estate houses. Work designed for salt air and the tramontana, with a fixed written quote and a site manager who keeps you informed even if you live far away.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Costa Brava
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit on the Costa Brava
Warrantyon the work
Renovations on the Costa Brava

Renovating on the Costa Brava,
with the sea in front.

The Costa Brava is the Girona coastal strip that runs from Blanes to Portbou, some 214 km spread across La Selva, the Baix Empordà and the Alt Empordà. Almost everything renovated here is a second home: estate houses, villas beside the cove and apartments from the tourist boom of the ’60s. If you are looking for house renovations on the Costa Brava, the challenge is not only the work: it is the salt air, the wind, the coastal law and the fact that many owners do not live in the house. We settle it with a fixed quote, a timescale in writing and a single site manager. If you would like to understand all the nuances first, there is the guide to renovations on the Costa Brava.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Hallway with herringbone parquet, a wooden step and, at the far end, a glazed door with a black frame
By type of building

What is renovated on the Costa Brava, and how we approach it.

A house with a garden and a front-line apartment are not renovated the same way. These are four typical jobs on the coast.

01

Estate houses and villas

Two-storey houses with a terrace, garden and sometimes a pool: full renovation, kitchen and bathrooms, joinery and outdoor space, with the finish of a home used intermittently.

02

Front-line apartments

Small flats from the ’60s and ’70s with worn-out services and an exposed terrace: we renew everything and leave them ready to enjoy or let.

03

Roofs, terraces and pools

What suffers most from sun, wind and salt: waterproofing, flooring, enclosures and pool construction or renovation.

04

Restoration of the existing home

Houses with decades of salt air in joinery, ironwork and services: phased restoration, without extending what the coastal law does not allow.

One coast, three comarcas

From Blanes to Portbou: each stretch calls for its own job

The coast is not homogeneous. In La Selva (Blanes, Lloret, Tossa) apartments and second-home estates dominate; in the Baix Empordà (Sant Feliu, Palafrugell, Begur, Palamós) cove villas and old stately houses live side by side; and in the Alt Empordà (Roses, L’Escala, Cadaqués, Llançà) the tramontana rules over closures and joinery.

This page is the view from the coast. If your house is inland — a masía, a medieval village house — you will find it on the page for the inland Empordà. And to decide what to do, what licences are needed and what mistakes to avoid, the guide to renovations on the Costa Brava is the background reading; here we explain how we carry it out.

  • La Selva: apartments and estates
  • Baix Empordà: cove villas and old houses
  • Alt Empordà: the tramontana and robust closures
See detached-house renovation services →
Coastal Law

Renovating by the sea: what the protection easement allows

The Coastal Law (22/1988) establishes a protection easement of 100 metres inland from the shore, extendable, and prohibits residential buildings within it. That does not mean a house already built cannot be renovated: the law itself admits, in buildings that are legalised or were built under a licence granted before the law, works of repair, improvement, consolidation and modernisation as long as they involve no increase in volume, height or floor area.

What does change is the margin: extending, adding a storey or enclosing a terrace may be unviable, and the law requires a responsible declaration and improvements in energy efficiency and water saving. Each plot depends on its boundary survey, so we look at it on the technical visit and tell you in writing before quoting. We handle the project and licence that applies with the registered technical architect.

  • 100 metres of easement from the shore
  • Improvement works yes, extending volume no
  • We check before quoting
Licences and projects →
Salt air and tramontana

Terraces, roofs and windows that stand up to the sea

On the coast the weather works all year round: salt in the air, strong sun and the tramontana, a cold, turbulent wind that in the Empordà can last for days on end. You notice it first in what is outside: roofs and terraces that leak, rusted ironwork and closures that whistle. A well-waterproofed roof is the first investment in any second home.

Then come windows and enclosures with corrosion-resistant ironmongery and good sealing, and, if the house has a garden, the renovation of the pool or the construction of a new one. A house that is shut for months needs nothing to depend on someone noticing in time.

  • Roofs and terraces waterproofed
  • Joinery and ironmongery resistant to salt
  • A low-maintenance pool and outdoor space
Flat roof freshly waterproofed with a ladder leaning on it, on a job in Santa Coloma de Gramenet
Calendar and distance

When to renovate and how to run the job if you do not live here

Many councils limit works in high season. Castelló d’Empúries, for example, in its town centres of Castelló, Castelló Nou, Mas Nou and Empuriabrava, does not allow new works to be started in July or August: works already under way can be finished with working hours of 9 to 19 h, no work at weekends or on public holidays and no structures, demolitions or earthmoving, and in August, in addition, no angle grinders, drills or deliveries of materials (an amendment to art. 53.6 of its by-law on coexistence, definitively approved on 28 May 2026 and in force since 7 July 2026). Every municipality has its own rules, so we fix the start date with the licence and the local calendar, normally outside summer.

For anyone who lives in Madrid, Europe or abroad, the job is run with regular reports with photos, decisions in writing and a single site manager who deals with the trades. You have the detail in our guide on renovating a second home from a distance. If you also want to let it, see renovations for holiday letting. The jobs published are in projects.

  • Start of works agreed with the municipal calendar
  • Regular reports with photos
  • A single contact for the trades
Work out your budget →
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Prices

What it costs to renovate on the Costa Brava.

Indicative ranges on the Costa Brava, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate on the Costa Brava — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation on the Costa Brava

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating on the Costa Brava.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate on the Costa Brava.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Stretches of the Costa Brava where we renovate.

From south to north, four reference points with a page of their own. We work along the whole Girona coast.

We renovate mainly in:

Blanes

The southern gateway to the Costa Brava, with Sa Palomera as its symbolic start: flats and apartments by the sea and neighbourhoods such as S’Abanell.

See renovations in Blanes →

Sant Feliu de Guíxols

A seafront promenade with old buildings beside flats from the tourist era: restoration of buildings and full renovations.

See renovations in Sant Feliu de Guíxols →

Palafrugell

Coves and coastal settlements such as Calella, Llafranc and Tamariu, with a population that multiplies in summer: seasonal homes that are shut for months and call for work from a distance.

See renovations in Palafrugell →

Roses

On the Gulf of Roses, with tourism since the ’60s: apartments and houses that take the tramontana full on and call for robust joinery and closures.

See renovations in Roses →

And also in other points of the coast:

Lloret de MarTossa de MarPlatja d’AroPalamósBegurL'EscalaCadaquésLlançàPortbou
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating on the Costa Brava: prices, licences, timescales and grants.

How much does it cost to hire a renovation company on the Costa Brava?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. In the price section of this page you have two complete examples — an 80 m² flat and a 120 m² house — worked out from our own quotes; for larger detached houses see the price pages for detached-house renovation. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen on the Costa Brava?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating on the Costa Brava?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

How do I hire house renovations on the Costa Brava?

For renovations on the Costa Brava we work like this: a free technical visit, a quote fixed and broken down item by item, a timescale in writing and a single site manager. As a reference, there is the price page for renovating a 200 m² detached house; the final amount is fixed after seeing the house and its plot.

What can I do to my house if it is in the protection easement zone of the Coastal Law?

As a general rule, the protection easement reaches 100 metres inland from the shore and prohibits building new homes; in an existing house that is legalised or was built under a licence granted before the 1988 Coastal Law, works of repair, improvement, consolidation and modernisation are admitted as long as they do not increase volume, height or floor area, with a responsible declaration and an improvement in the energy rating. Each plot depends on its boundary survey, so we check before quoting.

Can work be done in summer on the Costa Brava?

It depends on the council. Castelló d’Empúries, for example, does not allow new works to be started in its town centres in July or August, and works already under way are limited in hours and cannot include structures or demolitions. We plan the start with the municipal calendar and, if needed, begin in autumn so the house is ready before the season.

How do you manage the job if I live outside Catalonia?

With regular reports with photos, decisions in writing and a single contact who receives the trades and looks after the house. There is a specific guide on renovating a second home from a distance in this page’s blog section.

What changes in a job because of salt air and the tramontana?

Corrosion-resistant joinery and ironmongery, well-sealed windows, waterproofed roofs and terraces and protection of what is left exposed. The tramontana is especially intense in the Empordà and can blow for several days in a row, so closures and shutters are sized for that wind.

Do you carry out the restoration of homes on the Costa Brava?

Yes. Restoring homes on the Costa Brava includes consolidating roof and façade, treating damp, renewing services and modernising the layout, always within what the planning and coastal regulations allow on each plot.

Free quote

Ask for your quote, no strings attached.

A free technical visit on the Costa Brava and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →