We renovate in both comarcas of the Empordà, the Alt with its capital in Figueres and the Baix with its capital in La Bisbal. The inland is where the stone is: stone masías, village houses and homes that stand up to the tramontana. A fixed written quote and one site manager from start to finish.
The Empordà is two comarcas, the Alt Empordà and the Baix Empordà, joined by an open plain where the villages rise on small hills and the tramontana rules the climate. It shows in the houses: thick stone walls, low roofs, timber beams and, in the masías, Catalan vaults. Renovating here begins by reading the building: which wall is load-bearing, where the damp comes from and what procedure the land it stands on demands. We do it with a free technical visit, a quote fixed item by item and a single site manager.

An isolated masía on the plain, a house between party walls in a medieval village and a flat in a comarca capital are not renovated the same way. We fit the job to what you have.
Rubble walls, timber beams and, often, Catalan vaults. We consolidate structure, treat damp and give thermal comfort without losing the character of the mas.
Stone houses between party walls, with narrow streets for getting materials in and, in protected villages, their own conditions for work.
Ground-floor and upper-floor houses, of brick and joist floors, that call for an envelope, new services and a more open layout.
Homes in Figueres or La Bisbal d’Empordà: full flat renovation, with kitchen, bathrooms and complete services.
In a stone masía, the vaults and the beams are part of what makes it valuable. The job starts by knowing what state they are in.

Empordà masías usually combine rubble walls, timber-beam floors and Catalan vaults. A well-preserved vault is left exposed and used; the beams are checked one by one, because damp and woodworm act above all at the bearings on the wall.
The photos on this page are from two of our jobs in Barcelona and Manresa, not the Empordà, but they show the method: an 80 m² full renovation in Gràcia, in 10 weeks, where the vault was left exposed, and the 75 m² strip-out of a flat in an old building in Manresa, with timber beams exposed, a job in progress. We take the services out before closing anything up.
See the masía-renovation serviceBearings on the wall, woodworm and deflection: we decide what is kept and what is reinforced.
Cracks, rising damp and the joints of the rubble before any finish.
The roof is the first defence against rain and the tramontana: it is checked and insulated.
The tramontana, a dry, cold wind that blows above all in the colder months, is not noticed on paper but it is in the heating bill. In an isolated masía on the plain there is nothing to slow the wind, and an old window leaks air through the joints even when it closes well. The solution is not only to change the glass: what counts is the window’s airtightness, how the shutters close and how the junction with the stone wall is sealed.
The same with the roof: the tiles are fixed so that the wind does not lift them and the insulation beneath is checked. You have the detail on our pages on windows and enclosures and roofs and tiling.
A masía is usually on non-developable land. To renovate it, many councils have a catalogue of masías and rural houses: a special plan that identifies the buildings that can be restored and fixes, building by building, which works, extensions and uses they admit. It is validated by the Generalitat’s Territorial Urban Planning Commission (Comissió Territorial d’Urbanisme). If your masía is on it, the way forward is usually defined; if not, the margin is much smaller.
Each council has its own at a different stage of processing, so we take nothing for granted: we go with you to ask at the council and, with the answer, give you a quote. We explain it in renovating a masía: licences, materials and common mistakes and in restoring a stone masía.
The Empordà has settlements such as Pals, Peratallada or Monells in the Baix Empordà and Castelló d’Empúries in the Alt, with stone historic centres. La Bisbal d’Empordà, the capital of the Baix, is also known for its ceramic tradition. In these houses the renovation is done inside, unhurriedly: new services, comfort and exposed stone.
If what you are after is a home by the sea, apartments, detached houses and second homes on the coast, you will find it on our page on renovations on the Costa Brava. And if you want the detail comarca by comarca: Alt Empordà and Baix Empordà.
Work out your budgetWe come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.
A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.
We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.
One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.
Indicative ranges in the Empordà, based on real quotes. The final price is always a fixed quote after the visit.
| Quality level | What it covers | Price per m² | |
|---|---|---|---|
| Basic / functional | Standard finishes, layout unchanged | 520 – 650 €/m² | |
| Mid-range | Selected materials, possible re-planning | 750 – 940 €/m² | |
| High-end / luxury | Premium materials and exclusive interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:
Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.
In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.
Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.
The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.
A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.
Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.
In the Empordà, centres with heritage protection, masías on non-developable land and city flats live side by side. Each case has its own procedure at the council and we take care of it.
For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.
If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.
The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.
Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.
On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.
When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.
If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.
Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.
The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.
For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.
From the full renovation to a single trade. These are our most requested services.
We work in both comarcas. These are the towns with a page of their own, seen from the Empordà.
We renovate mainly in:
Capital of the Alt Empordà and the most populous city in the comarca: centre and Eixample flats, and the gateway to the masías of the plain.
See renovations in Figueres →On the bay where the Muga and the Fluvià reach the sea, with year-round and seasonal housing that we renovate according to use.
See renovations in Roses →A Baix Empordà municipality with a town centre and coastal settlements; for village houses and inland homes, the usual full renovation.
See renovations in Palafrugell →A Baix Empordà municipality with urban housing and village houses that we renovate inside with the same discipline on site.
See renovations in Sant Feliu de Guíxols →Other Empordà towns where we also work:
Official boundary data for comarques and municipalities (ICGC, 2025).
Everything you need to know about renovating in the Empordà: prices, licences, timescales and grants.
As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. In the price section of this page you have two complete examples — an 80 m² flat and a 120 m² house — worked out from our own quotes; a stone masía is valued separately, after the technical visit. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.
As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.
Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.
With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.
A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.
Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.
Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.
Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.
Yes, in both comarcas. If you want the detail of each, there is the Alt Empordà page and the Baix Empordà page.
Full renovations, house and masía renovations, and bathroom and kitchen renovations, in both comarcas. The process is the same as in the rest of Catalonia: a free technical visit, a quote fixed item by item, a timescale in writing and a single site manager.
The tramontana is a dry, cold wind that blows above all in the colder months. In a renovation it weighs on the joinery (airtightness and firm ironmongery), on how the roof is fixed and on insulation. We measure it on the visit and put it in writing in the quote.
It depends on each masía. Many councils have a catalogue of masías and rural houses that fixes which works, extensions and uses each listed building admits. Before buying or quoting it is worth asking the council whether yours is on it and what conditions it has. We help you check it and handle the licence.
Yes, on the conditions the council sets for each village. Before quoting we check which part is exposed stone, what can be changed on the façade and how the house is reached with materials, because on narrow streets that counts.
With a single site manager who keeps you informed in writing, timescales agreed from the start and a fixed quote. For seasonal homes there is a specific guide on our blog on managing from a distance.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →A free technical visit in the Empordà and a fixed written quote. We reply within 24 hours.