We renovate in a small municipality, right next to Badalona and split by the Rodalies R1 line: block flats near the beach, towers in the Turó del Mar and houses with a garden. A fixed written quote, notification or licence included and a single site manager.
Montgat covers barely 2.9 km² between the Mediterranean, Badalona, Tiana, Alella and El Masnou, and has a very varied housing stock: old buildings near the beach, blocks that grew from the ’60s with the closeness to Barcelona, tall towers in the Turó del Mar and houses with a garden in the residential areas. With the sea a stone’s throw away, the first thing we look at is the salt air — joinery, services, façades and damp. Then comes the rest: kitchen, bathroom, layout and, in houses, garden and pool. We work with a fixed quote, a free technical visit and a timescale in writing.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.
Worn-out services, joinery punished by salt air and old layouts: we renew everything and improve insulation and windows and doors.
Full renovation within the community: common areas protected, agreed working hours and efficient windows.
Interior, envelope and outdoor space coordinated by a single site manager, with a pool and garden where there are any.
Kitchen, bathroom and the habitability and energy certificates up to date in a short, well-planned job.
Anyone looking for pool construction in Montgat usually has a house with a plot in areas such as Les Costes or Residencial Camí d’Alella. Before digging there are two questions: what procedure the council asks for your plot — prior notification or a works licence, depending on the size and the classification of the land — and how the machinery gets in. A mini-excavator and a lorry need a street with enough width and turning room; if not, work goes in phases and with smaller equipment.
The same goes for the garden. We do not offer periodic maintenance, but we do renovate gardens and pool areas: non-slip paving, retaining walls, drainage, a pergola and lighting. You have our pages on pool construction, pool renovation and garden renovations; what an in-ground pool costs is explained in this guide.
With the sea so close, the marine environment attacks metal joinery, shutters, railings, consumer units and exterior walls. In the blocks that grew from the ’60s, the wear of the original services is added to it. On the technical visit we look at windows, downpipes, party walls and façade walls, and if there is damp we look for its cause before painting over it: damp treatment and waterproofing are part of the proposal.
To see how we work in the area there is a real job in a neighbouring municipality of the Barcelonès, not in Montgat: a new entrance staircase with a stair lift in Badalona, 20 m² in 3 weeks.

The Rodalies R1 line crosses Montgat with two stations, Montgat and Montgat Nord, and splits the municipality into zones. If your home is near the track, the windows and the insulation are the improvement you notice most, and a good seal also helps with salt air. Renovations of this kind are coordinated with windows and enclosures.
In the Turó del Mar, with its tall blocks, the work is organised as in any community: protected lift, working hours agreed with the administrator and notice to the neighbours. Les Mallorquines joins up with Badalona, so we also cover full renovations in Badalona, and the rest of the coast in full renovations in the Maresme.
We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.
A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.
We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.
One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.
Indicative ranges in Montgat, based on real quotes. The final price is always a fixed quote after the visit.
| Quality level | What it covers | Price per m² | |
|---|---|---|---|
| Basic / functional | Standard finishes, layout unchanged | 520 – 650 €/m² | |
| Mid-range | Selected materials, possible re-planning | 750 – 940 €/m² | |
| High-end / luxury | Premium materials and exclusive interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:
Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.
In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.
Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.
The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.
A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.
Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.
In Montgat the procedure is run by the Ajuntament: prior works notification (comunicació prèvia d’obres) or a planning licence, depending on the work. We handle the documents, the habitability certificate and the energy certificate.
For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.
If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.
The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.
Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.
On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.
When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.
If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.
Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.
The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.
For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.
From the full renovation to a single trade. These are our most requested services.
Montgat is split into small settlements, separated by the railway, the roads and the relief of the Serralada Litoral.
We renovate mainly in:
The most populated settlement, formerly industrial and today mostly residential, continuous with Badalona’s urban grid: flats that we renovate inside.
Built on the land of the former Can Galceranet estate, with tall blocks where we prioritise windows and efficiency.
An old neighbourhood and the area of the Montsolís beach: long-established homes exposed to the marine environment.
Areas of houses and plots, where renovations include outdoor space, garden and sometimes a pool.
And also in:
Official boundary data for comarques and municipalities (ICGC, 2025).
Everything you need to know about renovating in Montgat: prices, licences, timescales and grants.
As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. In the price section of this page you have two complete examples — an 80 m² flat and a 120 m² house — worked out from our own quotes; in Montgat both types of home live side by side. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.
As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.
Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.
With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.
A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.
Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.
Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.
Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.
Yes. If you are looking for pool construction in Montgat, we build in-ground pools in houses with a garden: excavation, structure, waterproofing, filtration and finishes, with a quote fixed by chapter. We have a page of our own on pool construction and another on renovating existing pools.
As a pool-construction company in Montgat we handle the procedure with the council: depending on the size and the plot, a prior notification or a works licence is filed, and we prepare it with the registered technical architect. Before quoting we confirm which procedure applies to your plot.
We do not take periodic maintenance contracts. If you are looking for garden construction and maintenance in Montgat in the sense of renewing: yes, we renovate gardens and pool areas — paving, walls, drainage, pergolas, lighting — and hand over the finished space. Recurring pruning and watering are not something we offer.
First we look at what has been damaged: joinery, downpipes, meter cabinets or damp walls. We propose materials resistant to the marine environment — aluminium with a thermal break, waterproofing where needed — and we treat the damp at its source, not just the paint.
In homes near the R1 line, the windows are what you notice most. We replace the joinery with double glazing and an airtight closure, and check shutters and shutter boxes. We explain what improvement to expect before you sign, without promising absolute silence.
Montgat’s Ajuntament has the prior works notification on its e-office and handles planning licences through its Urbanisme service, by appointment. Which applies to your work depends on whether structure, façade or use is touched; we pin it down on the technical visit and file it ourselves.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →A free technical visit in Montgat and a fixed written quote. We reply within 24 hours.