Renovations · Palafolls

Full home renovations in Palafolls: houses with a garden by the Tordera, and pool construction

We renovate in the northernmost municipality of the Maresme, on the border with Girona: detached houses in Ciutat Jardí, Sant Genís or Mas Reixac, and flats in Les Ferreries. Also pool construction in Palafolls, with a fixed written quote and a single site manager.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Palafolls
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Palafolls
Warrantyon the work
Renovations in Palafolls

Renovating in Palafolls,
between the Tordera and the castle.

Palafolls spreads across the plain of the river Tordera, which marks the boundary with the province of Girona, and climbs to the first hills of the Serralada Litoral, with the ruins of its castle on top of the Turó del Castell. What is usual here is not the block of flats but the house with a plot: homes in settlements such as Sant Genís, Ciutat Jardí, Mas Carbó or Mas Reixac, and the urban area of Les Ferreries with the town hall and the schools. Renovating a house like that is a job of envelope, services and outdoor space at once, which is why we direct it with a single site manager and a fixed quote.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Finished open-plan kitchen with white units, grey floor and a slatted timber partition on the right
By type of building

Every house in Palafolls calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Detached houses with a plot

Layout, kitchen, bathrooms and services renewed, and a plan for the garden and outdoor space from day one.

02

Village houses of the historic core

Homes with thick walls and years behind them: sorting out damp, renewing services and gaining light without losing character.

03

Flats in Les Ferreries

Full or partial bathroom and kitchen renovations in the urban area around the town hall and the schools.

04

Pool and garden

Construction or renovation of the pool coordinated with the work on the house, under a single site management.

Pools at detached houses

Pool construction in Palafolls: the job planned together with the house

Anyone looking for pool construction in Palafolls usually has a house with a plot, and in a municipality of detached homes the pool is one of the most natural enquiries, and one of those that work best when integrated into a renovation. Before digging we have to look at the free area of the plot, the ground, where the filtration and services will run, and how the machinery reaches the garden.

If your house needs renovating and you want a pool, the sensible thing is to decide everything at once: that way the garden is not torn up twice. See our pool construction service and, to get an idea of costs, the guide to what an in-ground pool costs.

  • Plot and ground checked on the technical visit
  • Pool, filtration and surroundings in a single fixed quote
  • Council paperwork handled by us
See pool construction →
House and outdoor space

Renovating a house with a garden: from the interior to the pool

A house in Ciutat Jardí, Mas Reixac or Mas Carbó is renovated in layers: first services and layout, then kitchen and bathrooms, and lastly the outdoor space. If there is an old pool, pool renovation fits in the same programme, and the garden is closed off at the end so it is not trampled by the works.

The job that best illustrates the level of finish in a home is a renovated flat in an old building in Vic: 75 m² in 10 weeks. It is not in Palafolls, but it shows how a full renovation is handed over with a fixed timescale and quote.

  • One programme in writing
  • Pool and garden coordinated with the house
  • Written warranty
See the Vic full renovation →
Bathroom and kitchen

Bathrooms and kitchens in Palafolls: smaller jobs, same method

Not every job is a whole house. Often only the bathroom or the kitchen is renovated, and the process is the same: a free technical visit, an itemised quote and a site manager. As a reference in the comarca there is the kitchen renovation in Premià de Mar (Carrer de Sant Pere, six weeks): a complete new kitchen with granite or compact worktops, integrated appliances, tiling, flooring and extraction.

If you want to work it out before the visit, use the budget calculator, which starts from our own quotes.

  • 5 m² bathroom in 2 weeks (a Mataró job)
  • A quote fixed item by item
  • Online calculator for a first figure
Work out my budget →
Palafolls Ajuntament

Building permits in Palafolls

Works are processed with Palafolls’ Ajuntament. As a general rule in Catalonia, an interior renovation that does not touch the structure usually goes by prior notification, and a job that affects the structure or façade, or adds a construction such as a pool, needs a licence with a technical project. We confirm the detail with the council case by case.

We prepare the documents, file them and include them in the quote, with a registered technical architect when a project is needed. More information on licences and projects.

  • Prior notification or licence depending on the job
  • Technical project where it applies
  • Habitability and energy certificates when finished
Licences and projects →
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Prices

What it costs to renovate in Palafolls.

Indicative ranges in Palafolls, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Palafolls — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Palafolls

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in Palafolls.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in Palafolls.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Palafolls settlements where we renovate.

The municipality is split into several settlements; these are the main ones.

We renovate mainly in:

Les Ferreries

The urban centre, with the church of the Assumption, the town hall and the schools: flats and houses to renew.

Sant Genís and Ciutat Jardí

The settlement of the Romanesque church and the residential estate of houses that forms part of it.

Mas Carbó and Mas Reixac

Settlements of detached houses where the renovation usually includes outdoor space and often a pool.

Santa Maria and Sant Lluís neighbourhoods

Neighbourhoods of the municipality where we carry out complete and partial home renovations.

And also in:

Les FerreriesSant GenísCiutat JardíMas CarbóMas ReixacSanta MariaSant LluísMalgrat de MarBlanesSanta SusannaTordera
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Palafolls: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Palafolls?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. In the price section of this page you have two complete examples — an 80 m² flat and a 120 m² house — worked out from our own quotes; in Palafolls the house with a plot is the most usual case. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Palafolls?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Palafolls?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Do you build swimming pools in Palafolls?

Yes. We build the in-ground pool in the garden of the house and coordinate it with the rest of the renovation, with a fixed quote and a single site manager. You can see the service on our page on pool construction and reference costs in the in-ground pool price guide.

Do I need a licence to build a pool at a house in Palafolls?

A pool is a job of some substance and has to be processed with the council, normally with a technical project. What can be built depends on the plot and the municipal planning, so we check on the technical visit before quoting and we file the documents ourselves.

Do you renovate existing pools in Palafolls?

Yes: lining, waterproofing, filtration and surroundings. If your pool loses water or the shell has deteriorated, we check it on the visit and give you a quote broken down item by item.

Do you also work in Malgrat de Mar, Santa Susanna or Tordera?

Yes. We work across the Maresme and in the neighbouring municipalities of La Selva, with the same method: a free technical visit, a quote fixed item by item and a single site manager.

Do you renovate houses with a pool and garden in one go?

Yes. It is the most logical combination in a detached house: a single site management for interior, outdoor space and pool, with one programme in writing and fewer dead timescales between trades.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Palafolls and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →