A complete refurbishment of a 150 m² masía — the traditional Catalan stone farmhouse — runs between 102,000 and 132,000 € at a functional specification, between 169,000 and 218,500 € at mid-range and between 262,500 and 340,000 € for high specification. Always excluding VAT. These figures are built item by item: the standard trades come from our own price table, and the masía-specific work — consolidating stone walls, autonomous sewage treatment, technical fees — from 2026 market ranges, because we have not yet closed a masía of our own to test them against. It is the size at which the roof and the structure stop being one item among others and become the budget: between the two they take close to a quarter of the total before a single finish is touched.

Standard finishes, layout unchanged
Selected materials, possible re-planning
Premium materials and interior design
Indicative prices · VAT not included · not a binding offer. Your exact figure comes from the free site visit, fixed and itemised.
A masía is not renovated, it is rehabilitated: the building has stood for between one and three hundred years, several generations have altered it and almost nothing conforms to a standard measurement. That changes the budget in one specific direction — the heavy work rules and finishes weigh less — and it changes the method: first you diagnose, then you design and only then do you put a price on it.
The figures on this page are an item-by-item construction for a masía of 150 m² built over two floors, with a pitched roof and rubble-masonry walls. If your masía has annexes, a threshing floor, a hayloft or a third storey under the roof, the floor area to be rehabilitated is larger than the one the land registry gives as dwelling. We work across the whole of Catalonia, and masía renovation is concentrated in the Vallès and the inland comarcas.
Excluding VAT. The standard trades come from our price table, built from 24 of our closed quotes; the masía-specific items — stone walls, autonomous sewage treatment, technical fees and charges — from 2026 market ranges. It is an indicative construction, not a quote: on a masía the real number comes out of the pathology report.
| Item | Functional | Mid-range | High spec | % of total |
|---|---|---|---|---|
| Demolition and lifting of flooring | 2,100 € | 2,850 € | 5,400 € | 1% |
| Rubble and waste removal · 55 m³ — a masía produces twice as much as a flat | 1,540 € | 2,255 € | 3,575 € | 1% |
| Consolidating and repointing stone walls · 215 m² of wall — the item that does not exist in a flat | 11,825 € | 20,425 € | 32,250 € | 11% |
| Structure: floors and reinforcement · 70 m² of floor; in a masía there is almost always timber to replace | 1,400 € | 4,690 € | 8,190 € | 2% |
| Roof (complete refurbishment) · 80 m² of pitch | 7,760 € | 13,280 € | 17,760 € | 7% |
| Waterproofing | 896 € | 2,752 € | 3,072 € | 1% |
| Façade: render and finish · 175 m² on four faces, not one | 4,900 € | 8,050 € | 16,800 € | 4% |
| Thermal and acoustic insulation | 2,700 € | 3,300 € | 3,600 € | 2% |
| Complete electrical installation | 3,793 € | 3,867 € | 3,976 € | 2% |
| Plumbing and drainage · 14 points | 3,640 € | 5,096 € | 7,154 € | 3% |
| Autonomous sewage treatment (septic tank or plant) · if there is no municipal network, which is the norm | 3,000 € | 5,000 € | 8,000 € | 3% |
| Heating (underfloor + generation) · a masía almost never comes with usable heating | 8,250 € | 11,250 € | 15,000 € | 6% |
| Exterior joinery · 14 openings, many of non-standard size | 7,742 € | 16,100 € | 31,024 € | 8% |
| Internal joinery · 11 doors | 2,750 € | 6,325 € | 8,580 € | 3% |
| Building work: renders and bases | 5,400 € | 5,400 € | 5,700 € | 3% |
| Interior flooring | 4,050 € | 6,000 € | 10,950 € | 3% |
| Complete bathrooms · 2 bathroom(s) | 20,510 € | 31,518 € | 40,934 € | 16% |
| Complete kitchen | 5,518 € | 7,650 € | 14,961 € | 4% |
| Skimming and painting · wall and ceiling surface, not floor | 5,400 € | 8,640 € | 9,000 € | 5% |
| Access equipment, scaffolding and protection | 906 € | 1,020 € | 1,422 € | 1% |
| Building labourers’ assistance | 960 € | 1,197 € | 1,923 € | 1% |
| Preliminary pathology study · compulsory in practice for a masía | 1,500 € | 2,600 € | 4,000 € | 1% |
| Project and technical supervision · 8-14% of the PEM (material execution budget); a masía always needs a project | 8,403 € | 18,333 € | 34,898 € | 10% |
| Fees and major-works licence · 1-4% depending on the municipality | 1,050 € | 4,167 € | 9,971 € | 2% |
| Total for the example budget | 115,993 € | 191,765 € | 298,140 € | |
| Equivalent per m² | 773 €/m² | 1,278 €/m² | 1,988 €/m² |
In a flat, the dear items are the kitchen and the bathrooms. In a 150 m² masía, they are not: they are the roof and what holds it up. An 80 m² pitch rehabilitated completely — stripping the tiles, repairing or replacing the timber structure, insulating, waterproofing and tiling again — is the single biggest item in the table, and the interior floors come right behind.
The practical consequence is counter-intuitive: adjusting the finishes barely moves the total. Swapping the porcelain for a cheaper one over 150 m² saves a few thousand; giving up repairing the structure saves nothing, because it is not optional. That is why on a masía the price lever is in the scope, not in the catalogue. The same happens, on a smaller scale, in a 150 m² house, where the roof also comes into play but without the exposed timber or the rubble-masonry walls.
We say it here and not in the small print: we have not yet delivered a masía of our own. On the rest of this site’s price pages you will see two of our jobs with their photos and real cost; on these four there are none, because we do not have them, and putting a renovated flat in their place would be selling you an experience the photos do not support.
What we have done is the heavy work that rules in a masía. In our refurbishment of a building in Santa Coloma we rebuilt floors, fitted a new steel structure and worked on two levels with the building open: these are exactly the items that take a quarter of the budget in this table. The photos on this page come from that job, and each caption says where it comes from.
For the rest, the honest answer is a visit. On a masía no serious company gives you a number over the phone: someone goes up on the roof, trial openings are made and a pathology report is written. That report costs between 1,500 and 4,000 € and is the only thing that turns the figures above into a quote. If you are weighing up a purchase, ask for it before signing, not after.
The roof is the item with the most distance between functional and high specification in the whole table, and also the one that deviates most from the initial budget. The reason is simple: until the tiles come off you cannot see the real state of the trusses, purlins and boarding.
The three scenarios, from least to most: repair — the timber holds, it is treated, specific points are reinforced and the roof is covered again with the reclaimed tile —; partial replacement — one pitch or a couple of trusses —; and rebuild — a new structure, usually steel or laminated timber, with new or mixed tile.
An honest quote for a masía fixes the price of the first hypothesis and writes down the other two with their price, instead of giving a round number that later gets reopened. If whoever is quoting has not climbed onto the roof, the number they give you means nothing. That goes for any roof, but on a masía the difference between hypotheses is measured in tens of thousands.
Survey, trial openings and a pathology report; without this any figure is a round number
Signing-off, submission to the council and, if listed, a heritage report
Perimeter scaffolding, stockpiles, removal of whatever is not kept
The phase that stops the deterioration: floors, trusses, insulation and waterproofing
Electrics, plumbing, autonomous sewage treatment, heating and exterior joinery
Flooring, tiling, bathrooms, kitchen, painting and internal joinery
30–44 weeks — A complete 150 m² refurbishment takes the building time the table above implies, but what throws almost everyone is what comes before: between the pathology study, the project and the major-works licence, three to nine months pass before anyone enters the property. Count that stretch from the start.
Licence and procedures. Major works, always: a project drafted by a competent technician, technical supervision, a health-and-safety study and council charges, which in Catalonia run from 1 to 4% of the execution budget depending on the municipality. If the masía is on the register of protected buildings, the file also goes through heritage and adds months. All of that is in the breakdown above, not hidden in the small print.
Not every cut has the same effect: these are the items where saving is sensible, and the ones where it ends up costing more.
Functional and mid-range ranges, excluding VAT. The price per metre falls with floor area because the start-up items do not grow.
| Floor area | Functional | Mid-range |
|---|---|---|
| 100 m² masía | 71,500 – 92,500 € | 117,000 – 152,000 € |
| 200 m² masía | 123,000 – 159,500 € | 204,500 – 265,000 € |
| 300 m² masía | 174,000 – 225,000 € | 290,500 – 376,500 € |
| 150 m² house (no stone walls) | — | See page |
* Indicative prices, excluding VAT. They vary with the starting condition of the home, the municipality and the finishes chosen.
The ones we are asked most before a quote is signed.
Between rehabilitating the pitch and waterproofing, around 10-12% of the mid-range budget, and it is the single biggest item. If the timber structure has to be rebuilt instead of repaired, that figure easily goes above 20%.
Very little. In a 150 m² masía the finishes are a smaller fraction of the total than in a flat: what is dear is the envelope and the structure, and a catalogue does not make those cheaper. If the budget has to be adjusted, you adjust scope — less area rehabilitated now, the rest in a second phase — and not quality.
If the structure is sound, yes, and it is the usual thing: it is planed, treated against wood-boring insects and left on show. It is cheaper than replacing it and it is the reason many people buy a masía. What you cannot do is decide beforehand: the treatment only works on timber that keeps its section.
Yes. Touching structure and roof is major works in any municipality, with a project, technical supervision and the corresponding charges, which are in the table. If the masía is listed, the file also goes through heritage and the timescales stretch.
Full renovations in Barcelona and across Catalonia. A fixed, itemised quote, a dedicated site manager who keeps you informed and a written warranty.
A free site visit, a fixed itemised quote and a written programme. What we sign is what you pay.