We design and renovate kitchens in Santa Coloma de Gramenet — from opening the kitchen to the living room to renewing services, units and appliances — adapting to small flats and dense blocks beside the Besòs. A fixed quote in writing and a site manager from start to finish.
Renovating the kitchen in Santa Coloma de Gramenet is much more than changing the units: we renew plumbing, drainage and electrics, adjust the layout to gain worktop and storage space, and choose worktops, wall finishes and appliances that stand up to daily use. In Santa Coloma de Gramenet the usual job is working with small flats and dense blocks beside the Besòs, so we study each kitchen on its own.
We take care of everything with a single point of contact: demolition, building work, services, tiling, made-to-measure units and commissioning, with a fixed quote after the free technical visit and a written guarantee on the work. If the bathroom is due as well, we do it in the same job so the floor is lifted only once — that is how we set it out in bathroom renovations — and with the budget calculator you have a first range before we come to measure.

Indicative ranges by specification and appliances, VAT excluded. The final figure comes from the survey.
| Specification | What it covers | Indicative range (€) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 4,800 – 7,500 € | |
| Mid-range | Selected materials, best balance | 6,600 – 10,300 € | |
| Design / high end | Premium materials and high-end interior design | 13,300 – 19,500 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full kitchen renovation, VAT excluded.
The galley kitchen of a city flat. Made-to-measure storage is what makes these work, and it is where the budget should go.
The most common size. Enough room for a breakfast bar or a peninsula and a proper run of worktop.
Island and dining space. At this size the design and the appliances set the price, not the square metres.
The single change that transforms a flat most. Add the partition and structural item on top of the kitchen itself.
In a kitchen the floor area matters less than the material grades, the worktop and the appliances. That is why we price a specific design rather than a rate per square metre — and why the quote names what is in it.
The scope of a turnkey kitchen renovation, and what normally sits outside it.
VAT (10% or 21% depending on your case) is always shown as its own line. If you are supplying the appliances we will fit and integrate them — just tell us the models before we design the units, because a freestanding fridge and an integrated one need different openings.
The same team and the same fixed quote, for the rest of the home in Santa Coloma de Gramenet.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Our own jobs, each with its project and budget behind it — tap any photo to see the whole job.
Kitchen renovations in Santa Coloma de Gramenet: what you ask us most.
In Santa Coloma, a complete kitchen with units and appliances usually runs from 4,800 to 19,500 € depending on floor area, specification and the condition of the services. The final price is fixed and in writing once we have seen the home.
In most cases yes. We check what is partition and what is load-bearing before touching anything; if it can be done, we join kitchen and living room to gain light and space, and we record it in the fixed quote.
Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.
No, we plan for it. Before starting we plan how materials are taken up, how rubble is removed and how the staircase is protected, so we hit the timescale despite the difference in level.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.