The short answer, from the figures in our real quotes: a full renovation of an 80 m² house runs between 50,600 and 63,900 € at a functional specification, between 75,400 and 95,200 € at mid-range and between 108,800 and 137,400 € for high specification. Always excluding VAT. The itemised example budget below comes to 53,179 € at functional, and it carries two items a flat never pays for: the roof and the façade. They are 10,280 € of the 53,179 — 19% of the total, and the real reason a house costs more than a flat of the same size.

Standard finishes, layout unchanged
Selected materials, possible re-planning
Premium materials and interior design
Indicative prices · VAT not included · not a binding offer. Your exact figure comes from the free site visit, fixed and itemised.
The 80 m² house in the Barcelona area is, almost always, a single-storey village house, or ground floor plus a small attic room: two or three bedrooms, a bathroom, a WC, a kitchen of about 9 m², a living-dining room and often a back yard. There are hundreds of them across the Vallès, the Maresme and the Penedès, and they usually date from the fifties or sixties.
The difference from a flat is not in the interior metres: it is that the house is yours all the way up to the roof. Those 80 m² on a single floor mean 80 m² of roof and about 90 m² of façade that nobody shares with you — there is no owners’ community paying half.
That is why the euro per metre of an 80 m² house (665 €/m² at functional) comes out above that of a flat of the same size: you are adding a whole building on the outside to the same interior.

Figures calculated item by item from our price table (real, signed quotes), for a single-storey 80 m² house with three bedrooms, a bathroom, a WC, a kitchen, 80 m² of roof and 90 m² of façade. Excluding VAT; not a binding offer. Your quote comes itemised and fixed after the free technical visit. The three ranges above come from that same total using the rule our calculator applies: from 5% below to 20% above. It is deliberately asymmetric, because in a house the upside risk is set by whatever turns up when the roof is opened.
| Item | Functional | Mid-range | High spec | % of total |
|---|---|---|---|---|
| Demolition and rubble clearance · floor lifted + strip-out | 1,504 € | 2,012 € | 4,392 € | 3% |
| Building work and labouring | 2,624 € | 2,703 € | 3,073 € | 3% |
| Plasterboard and suspended ceilings (~32 m²) | 1,472 € | 1,728 € | 2,080 € | 2% |
| Plumbing (adaptation + 10 points) · bathroom, WC and kitchen | 3,006 € | 4,168 € | 5,795 € | 5% |
| Electrics (6 rooms) · with certificate (CIE) | 1,338 € | 1,908 € | 3,294 € | 2% |
| Complete bathroom (~4 m²) · building work + tiling + sanitaryware | 10,255 € | 15,759 € | 20,467 € | 20% |
| Second WC (~2 m²) · toilet, basin and tiling | 837 € | 1,286 € | 2,161 € | 2% |
| Complete kitchen (~9 m²) · units, worktop and appliances | 5,518 € | 7,650 € | 14,961 € | 10% |
| Roof (80 m²) · complete refurbishment | 7,760 € | 13,280 € | 17,760 € | 17% |
| Façade (90 m²) · render and finish | 2,520 € | 4,140 € | 8,640 € | 5% |
| Flooring throughout (AC5 timber laminate) | 2,960 € | 3,440 € | 3,840 € | 4% |
| Internal joinery (6 doors) | 1,500 € | 3,450 € | 4,680 € | 4% |
| Windows (5 units) · if you keep yours, subtract this line | 2,765 € | 5,750 € | 11,080 € | 7% |
| Skimming and full repaint · ~240 m² of wall and ceiling surface | 9,120 € | 12,000 € | 12,240 € | 15% |
| Total for the example budget | 53,179 € | 79,274 € | 114,463 € | |
| Equivalent per m² | 665 €/m² | 991 €/m² | 1,431 €/m² |
In this page’s functional example budget, bathroom, WC, kitchen, services and roof come to 28,714 € — 54% of the total. A bathroom costs the same whether the house is 80 or 200 m²; a kitchen, likewise; and the roof is paid for by the metre of roof, not the metre of living space.
In a single-storey 80 m² house that arithmetic turns against you twice: there are few cheap metres — bedrooms and corridor — to spread the fixed cost over, and the roof covers the whole floor plan as well. It is exactly the size at which it pays most to compare items and not €/m².
If a quote for an 80 m² house comes in well below these figures, look at two lines before any others: what it says about the roof and what it says about the services. They are the two you cannot see from the living room and the two that cost three times as much when they have to be done again.
An 80 m² single-storey house has 80 m² of roof. Not 40, not 20: eighty. And the roof is priced by the metre of roof, so at mid-range it is 13,280 € — 17% of the entire budget, second only to the full bathroom. No other page on this site has a percentage like that, because no other type of home puts all its floor area under tiles.
Add the façade and the building envelope is 17,420 € of the 79,274 € at mid-range: 22%. Put the way it is really understood: the same interior scope in a flat would cost 61,854 €, and being a house makes it 28% dearer. That 28% is the honest answer to “why is mine dearer than my sister’s flat, if it has the same metres?”.
The good news is that this item has an enormous range — from 7,760 € to 17,760 € — and what decides where you land is not the finishes but the condition of the timber structure. That is why on a house the technical visit always starts at the top.

The first job is to open a trial hole in the roof and another in the slab: until we know what is underneath, a house budget is not closed. Then comes the removal of floors, wall finishes and non-structural partitions.
With the scaffolding up, everything outside gets done: refurbishing the roof, gutters and downpipes, and rendering the 90 m² of façade. If it rains, this is where days are lost.
New plumbing and electrics with their certificates for six rooms, building work for the bathroom and WC, and about 32 m² of suspended ceiling.
Tiling, complete bathroom, WC and kitchen, flooring, six doors, skimming and painting some 240 m² of walls and ceilings, the clean and a handover walk-round.
10–13 weeks (full renovation with roof) · 7–9 weeks (interior only) — A complete 80 m² renovation with roof and façade is 10 to 13 weeks of real building, and the difference from a flat of the same size lies almost entirely outside: two or three weeks of scaffolding. As a reference of our own, our 140 m² house in Cerdanyola del Vallès — a thorough interior refresh, without touching the roof — took 12 weeks. If the roof does not need work, take three to four weeks off the programme. We give it to you in writing with the quote.
Permits: what an 80 m² house needs. Here it differs from a flat. As long as the work is internal a prior notification is enough, but as soon as the roof or façade is touched — and on this page both are — almost every council asks for a technical project and a major-works licence, with its construction tax on the execution budget. In historic centres with protection a heritage report may also be needed on the type of tile and the colour of the render. We handle it and the cost is itemised as its own line, never as a surprise.
Not every cut has the same effect: these are the items where saving is sensible, and the ones where it ends up costing more.
These figures do not come from multiplying metres by an average €/m²: they are the same example budget recalculated item by item. Look at the €/m²: it drops sharply going from 80 to 100 m² because those extra metres usually go on a second storey, and then the roof is spread across twice the living space.
| Floor area | Functional | Mid-range |
|---|---|---|
| 80 m² house (one storey, 80 m² of roof) | 53,179 € · 665 €/m² | 79,274 € · 991 €/m² |
| 100 m² house (two storeys, 55 m² of roof) | 56,712 € · 567 €/m² | 83,499 € · 835 €/m² |
| 120 m² house (two storeys, 2 bathrooms) | 73,774 € · 615 €/m² | 109,017 € · 908 €/m² |
* Indicative prices, excluding VAT. They vary with the starting condition of the home, the municipality and the finishes chosen.
Carrer de Sant Ramon, Cerdanyola del Vallès140 m²12 weeksReal projectHouse renovation in Cerdanyola del Vallès (140 m²)The nearest house in size that we have completed: 140 m², not 80A thorough interior refresh, without touching the roofMain bathroom with a freestanding bath and double basin on timberUseful for comparing finishes; for the roof, look at the tableIndicative costindicative · excluding VAT50,000–54,000 €
Carrer Major, Santa Coloma de Gramenet210 m²28 weeksReal projectRefurbishment of a building in Santa Coloma (210 m²)Not a house: it is a building between party walls, and we say so plainlyRebuilt from the foundations, with a new steel structureFlat roof waterproofed and façade solved in the same jobThe reference for what happens when the building envelope is in poor conditionIndicative costindicative · excluding VAT145,000–160,000 €The ones we are asked most before a quote is signed.
From the figures in our real quotes: between 50,600 and 63,900 € at a functional specification, 75,400–95,200 € at mid-range and 108,800–137,400 € for high specification, always excluding VAT. The itemised example budget on this page comes to 53,179 € at functional, for a single-storey house with three bedrooms, a bathroom, a WC, a kitchen, 80 m² of roof and 90 m² of façade.
Because of the roof and the façade, which in a flat are paid for by the community or are not an item of yours at all. In the mid-range example budget they come to 17,420 € of a 79,274 € total. Take those two lines away and the same interior scope would come to 61,854 €: being a house makes it 28% dearer.
Between 7,760 € at functional and 17,760 € for high specification for the 80 m² of roof, with 13,280 € as the mid-range figure. The jump from one end to the other is set not by finishes but by the condition of the timber frame: if the rafters hold, you re-tile and waterproof; if they do not, the pitch has to be rebuilt. That is why we open a trial hole before closing the quote.
For purely internal work, no: a prior notification is enough. But as soon as the roof or façade is touched, most councils require a technical project and a major-works licence, with its construction tax. Since this page includes both items, the normal route is a licence. We handle it and the cost appears as its own line.
No, and we would rather say so: the closest completed house of ours in size is the 140 m² one in Cerdanyola del Vallès, 50,000–54,000 € and 12 weeks. The figures on this page come from our price table applied item by item to an 80 m² scope, not from a specific job of that size. For finishes, look at the Cerdanyola project; for the roof, look at the table.
Not while the roof and façade are being done, with the scaffolding up and the roof open. That is three weeks in which the house is not habitable, and there is a risk if water gets in. Afterwards, in the interior phase, it can be considered by zones if the house has two wings or two storeys. We tell you on the visit, according to the real scope.
No. Every figure on this page is the taxable base: VAT is on top. Which rate applies to you — the 10% reduced rate or the standard 21% — depends on whether it is for your private use, on the building being at least two years old and on materials not exceeding 40% of the total. We put it in writing and calculate it in the quote, rather than leave it to your judgement.