The short answer, from the figures in our real quotes: a full renovation of a 120 m² house with two bathrooms runs between 70,100 and 88,600 € at a functional specification, between 103,600 and 130,900 € at mid-range and between 146,700 and 185,300 € for high specification. Always excluding VAT. The itemised example budget comes to 73,774 € at functional. And here is the figure this page exists to give you: façade and roof add an 18% surcharge over the same interior scope in a flat — the lowest percentage on any of our house pages, and we explain why.

Standard finishes, layout unchanged
Selected materials, possible re-planning
Premium materials and interior design
Indicative prices · VAT not included · not a binding offer. Your exact figure comes from the free site visit, fixed and itemised.
The typical 120 m² house is a two-storey house between party walls, with three or four bedrooms and two full bathrooms, eight rooms counted for the electrics, seven window openings and a yard or back terrace. It is the neighbourhood house of Badalona, Santa Coloma, Sant Boi or Terrassa, and of the old town centres of the Vallès.
What unites them is not the layout but the condition: a façade with hollow render, joinery from the eighties and a roof that has had patches. The interior has been touched up in parts; the envelope almost never.
That is the reason this page exists. When you ask “how much more will it cost me than a flat?”, the answer is not a feeling: it is 16,770 € of façade and roof at mid-range on a 109,017 € budget, and we break it down below.

Figures calculated item by item from our price table (real, signed quotes), for a 120 m² two-storey house with four bedrooms, two full bathrooms, a kitchen, 65 m² of roof and 130 m² of façade. Excluding VAT; not a binding offer. External insulation is not included. The price bands at the top apply the calculator’s rule to each total: −5% / +20%. We do not give a 3% margin because that would be pretending to a precision we do not have: the real figure moves with the condition of the façade and roof and with the finishes you end up choosing.
| Item | Functional | Mid-range | High spec | % of total |
|---|---|---|---|---|
| Demolition and rubble clearance · floor lifted + strip-out | 2,256 € | 3,018 € | 6,588 € | 3% |
| Building work and labouring | 3,776 € | 3,855 € | 4,289 € | 4% |
| Plasterboard and suspended ceilings (~48 m²) | 2,208 € | 2,592 € | 3,120 € | 2% |
| Plumbing (adaptation + 13 points) · two bathrooms and kitchen | 3,786 € | 5,260 € | 7,328 € | 5% |
| Electrics (8 rooms) · with certificate (CIE) | 1,784 € | 2,544 € | 4,392 € | 2% |
| Complete bathrooms (~4 m² each) · two rooms: building work, tiling and sanitaryware | 20,510 € | 31,518 € | 40,934 € | 29% |
| Complete kitchen (~11 m²) · units, worktop and appliances | 5,518 € | 7,650 € | 14,961 € | 7% |
| Roof (65 m²) · complete refurbishment | 6,305 € | 10,790 € | 14,430 € | 10% |
| Façade (130 m²) · render and finish | 3,640 € | 5,980 € | 12,480 € | 5% |
| Flooring throughout (AC5 timber laminate) | 4,440 € | 5,160 € | 5,760 € | 5% |
| Internal joinery (8 doors) | 2,000 € | 4,600 € | 6,240 € | 4% |
| Windows (7 units) · if you keep yours, subtract this line | 3,871 € | 8,050 € | 15,512 € | 7% |
| Skimming and full repaint · ~360 m² of wall and ceiling surface | 13,680 € | 18,000 € | 18,360 € | 17% |
| Total for the example budget | 73,774 € | 109,017 € | 154,394 € | |
| Equivalent per m² | 615 €/m² | 908 €/m² | 1,287 €/m² |
At mid-range, the two bathrooms come to 31,518 € of a 109,017 € total: 29%. Eight square metres of house take almost a third of the bill, and there is no finishing trick that changes that order of magnitude: what a bathroom costs is the work you cannot see — waterproofing, falls, riser, drain, ventilation — and that part is worth the same in a 120 m² house as in a 60 m² flat.
With the kitchen and the services, the block that does not move with the metres reaches 51% of the functional budget. That is why the jump from 100 to 120 m² is not twenty metres of paint: it is 17,062 €, most of which is the second full bathroom, which appears where there used to be a WC.
The practical reading: if you are comparing two quotes for a 120 m² house, look first at how much each allots to the two bathrooms. If one of them is well below the 20,510 € in the functional column, it is cutting inside the wall, which is where you cannot see it and where it is most expensive to redo.

Let us take out of the table the two items a flat never carries. Without roof or façade, the mid-range example budget comes down to 92,247 €: that would be the cost of doing this same interior — four bedrooms, two bathrooms, kitchen, services, painting — in a 120 m² flat. With the two items in, it is 109,017 €. The difference, 16,770 €, is 18% more.
That 18% is the honest figure, and it is lower than is usually claimed. On our single-storey 80 m² house page the same calculation gives 28%, because there the roof covers the whole home. Here, with the 120 m² split over two levels, there are only 65 m² under tiles: the envelope is diluted across twice the house.
Hence the rule we repeat on the visit: the surcharge for being a house does not depend on the metres of house, but on the metres of roof. Two homes identical inside, one on the ground floor and the other on two levels, are separated by thousands of euros purely by how they are stacked.
And a warning about the other side of the coin: this 18% buys a new envelope with its waterproofing and its finishing details. In a flat, that same envelope ages at the community’s expense, with special levies you do not choose and at the moment the owners’ meeting decides.

A trial opening in the roof, another in the façade to see whether the render is still bonded, and removal of floors, tiling and non-structural partitions on both floors.
65 m² of roof and 130 m² of façade from the same scaffolding, and the seven window openings finished in the same move. Doing it together is what keeps the surcharge at 18% and no higher.
Plumbing with thirteen points for the two bathrooms and the kitchen, electrics for eight rooms with a certificate, and about 48 m² of suspended ceiling.
Tiling and waterproofing of the two bathrooms, kitchen, flooring, eight doors, painting some 360 m² of walls and a handover walk-round with the site manager.
13–16 weeks (with roof and façade) · 10–12 weeks (interior only) — 13 to 16 weeks for a full renovation that includes the envelope. Within that programme there are four weeks of scaffolding in which the roof, the façade and the finishing of the seven window openings get done: doing it in one move is what stops the surcharge for being a house from shooting above 18%. If the job is interior only, with the two full bathrooms, count on 10 to 12 weeks. The detailed programme comes in writing with the quote.
Permits: why at 120 m² it is almost always major works. Because this page touches the façade and roof. With that, most councils in the metropolitan area ask for a signed-off technical project, technical supervision and a major-works licence, with construction tax calculated on the material execution budget. There is a nuance worth knowing: if the façade faces a street with protective planning, the colour and the type of finish are not yours to choose; the ordinance sets them. We check before quoting, we handle the paperwork and the cost appears as its own line.
Not every cut has the same effect: these are the items where saving is sensible, and the ones where it ends up costing more.
Between 100 and 120 m² there is a 17,000 € jump at functional that floor area does not explain: the second full bathroom does. From 120 to 150 m², on the other hand, it is mostly flooring, painting and façade that grow, and that is why the €/m² falls again.
| Floor area | Functional | Mid-range |
|---|---|---|
| 120 m² house (two storeys, 2 bathrooms) | 73,774 € · 615 €/m² | 109,017 € · 908 €/m² |
| 100 m² house (bathroom + WC) | 56,712 € · 567 €/m² | 83,499 € · 835 €/m² |
| 150 m² house (two storeys, 2 bathrooms) | 83,309 € · 555 €/m² | 122,506 € · 817 €/m² |
* Indicative prices, excluding VAT. They vary with the starting condition of the home, the municipality and the finishes chosen.
Carrer de Sant Ramon, Cerdanyola del Vallès140 m²12 weeksReal projectHouse renovation in Cerdanyola del Vallès (140 m²)140 m², the completed house closest to these 120Interior only: neither roof nor façade was in the scopeThat is why it cost 50,000–54,000 € and not what this table showsThe most useful comparison we have for separating interior from envelopeIndicative costindicative · excluding VAT50,000–54,000 €
Carrer Major, Santa Coloma de Gramenet210 m²28 weeksReal projectRefurbishment of a building in Santa Coloma (210 m²)A building between party walls, not a single-family houseFaçade, flat roof and terraces solved in the same jobThe extreme case: when the envelope is rebuilt entirely28 weeks, against the 13-16 on this pageIndicative costindicative · excluding VAT145,000–160,000 €The ones we are asked most before a quote is signed.
Between 70,100 and 88,600 € at a functional specification, 103,600–130,900 € at mid-range and 146,700–185,300 € for high specification, excluding VAT. The itemised example budget comes to 73,774 € at functional, for a two-storey house with four bedrooms, two full bathrooms, a kitchen, 65 m² of roof and 130 m² of façade.
18% at mid-range, and the figure comes from subtraction: the example budget with the envelope is 109,017 €, and without roof or façade 92,247 €. The difference is 16,770 €. That percentage depends on the metres of roof, not the metres of home: on a single-storey 80 m² house it rises to 28%.
Between 20,510 € at functional and 40,934 € for high specification for the two rooms, with 31,518 € as the mid-range figure. It is 29% of this page’s mid-range budget. Most of that money goes on what you cannot see: waterproofing, falls, risers and ventilation. If the two bathrooms share a stack, the plumbing comes down noticeably.
Thermally, yes, and many municipalities offer grants; but it is not included in this page’s figures and we are not going to price it by eye. External insulation changes thicknesses, sills, window finishing and gutters: it is a project decision made before the scaffolding goes up, not an extra added afterwards. We price it separately and in detail on the visit.
If the façade or roof is touched, in practice yes: a signed-off project, technical supervision and a major-works licence, with construction tax on the execution budget. One nuance: on streets with protective planning, the finish and colour of the façade are set by the municipal ordinance. We check before quoting.
Not of that exact size. The closest completed house is the 140 m² one in Cerdanyola del Vallès, which was also interior only — neither roof nor façade — and that is why it cost 50,000–54,000 €, well below this page’s table. It is precisely the comparison you need to see how much the envelope weighs.
No, and for a practical reason: a VAT-inclusive price would be wrong for a good part of the people reading this. The 10% reduced rate depends on the home and the weight of the materials; in other cases 21% applies. Your quote shows the base, the rate that applies to you and the total.
Full renovations in Barcelona and across Catalonia. A fixed, itemised quote, a dedicated site manager who keeps you informed and a written warranty.
A free site visit, a fixed itemised quote and a written programme. What we sign is what you pay.