Restoring village houses in Palafrugell, Calella, Llafranc and Tamariu: stone walls that breathe, damp treated at the root and works planned around second homes.
A casa de poble, a village house, in the Baix Empordà stands on rubble-stone walls half a metre thick or more, timber floors or Catalan vaulting and a roof of curved clay tiles. It works because the wall absorbs and releases damp with the surrounding air. Cover it with cement or plastic paint and the damp does not disappear: it climbs higher or shows up inside. That is why we start by looking at the wall, not the catalogue of finishes.
What is done to the wall is not showy, and it decides the result. We hack off the cement render, repoint with lime mortar, open ventilation at the base if needed and treat rising damp where it is detected. Near the sea, in Calella, Llafranc or Tamariu, there is also salt: salts that lift paint and corrode ironmongery. It is solved by choosing mortars and joinery that can take it, not by repainting every spring.
Insulation calls for the same caution. Insulating inside with a sealed board shuts the wall in and brings condensation. The usual approach is to work on the roof, where most of the loss is, and to use lime renders with an insulating filler or breathable linings on the walls that justify them. Heating is planned for seasonal use: a house occupied at weekends and in summer needs to warm up quickly and to be dehumidified when shut, not continuous heating.
Almost all of these houses are second homes, and that conditions the calendar. It pays to start after the summer so that the structure and the walls have time to dry before the finishes, and to hand over before the next season. If you do not live there, we coordinate with a trusted contact for access and keys. On demolition, beams and floors show what can be saved; after the visit we set which wall is respected, which is reinforced and which is replaced.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 520 – 650 €/m² | |
| Mid-range | Selected materials, best balance | 750 – 940 €/m² | |
| High specification / luxury | Premium materials and high-end interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Full renovation of the whole property, from functional to mid-range specification, VAT excluded.
One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².
The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.
More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.
Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.
These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.
The scope of a turnkey full renovation, and the things that genuinely sit outside it.
VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.
What you find inside an old house changes with the area and with the period it was built.
One team for the whole job, in Barcelona and across Catalonia.
Restoring an old house in Palafrugell: questions from first-timers.
It depends on what we find on opening up. Almost always the roof and beams have to be checked, damp treated, the electrics and plumbing redone, and floors and joinery renewed. First we make a technical visit to see the state of walls, floors and roof; then we quote item by item, separating what is kept from what is replaced.
We do not give a figure per square metre without seeing the house, because in a stone house the difference between one and another is the state of the structure, the roof and the walls. After the free technical visit we hand you a quote fixed item by item, with what is kept and what is rebuilt clearly separated, so you can decide what to do now and what later.
It depends on the scope. If neither structure nor façade is touched, the usual route is prior notification to the Ajuntament; if floors are reinforced, openings are cut in load-bearing walls or the façade or roof is worked on, you need a technical project and a works licence. If the house is in an area with heritage protection, the procedure is different. We check with the Ajuntament before fixing the quote.
Yes, if the wall is not shut in. Insulation goes mostly on the roof, and lime renders and breathable linings are used inside instead of sealed boards. What we do not do is line a rubble wall with a vapour barrier: the damp that used to escape is trapped and shows up as mould or flaking.
Longer than a flat renovation, and almost never as predictable. The timescales depend on the state of roof and floors, on how long the walls take to dry after treatment and on whether a licence has to be applied for. We give you a phased programme after the visit and warn you about what we will only know on opening up. If it is a second home, we plan it to hand over before your next season.
Yes: the salt. Near the sea, hinges, railings and consumer units corrode faster, and salts lift paint and render. We choose joinery, ironmongery and mortars that can take it and finish with silicate or lime paints. In the town centre the challenge is more often rising damp and access than salt.
An installation that heats quickly when you arrive and controls humidity when the house is shut. An air-to-air heat pump, or aerothermal heating with underfloor heating in the living areas, usually works better than a boiler for continuous use. With thick walls, the house cools slowly and warms slowly, and that is designed in from the start.
Yes. We work in the town of Palafrugell, in Calella de Palafrugell, Llafranc and Tamariu, and in the masías around them. The technical visit is free; then we present the quote in writing, and if the house needs a project, we coordinate it with a technical architect.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.