With figures from our price table: a 6 m² bathroom with a toilet, bidet and double basin comes to 10,424 € at a functional specification, 15,985 € at mid-range and 20,845 € for high specification, excluding VAT; the ranges on the cards are that figure with our calculator’s margin, from 5% below to 20% above. Notice what has just happened: the budget already includes two more pieces than a 4 m² bathroom — the bidet and the second basin — and even so the total difference from it is 338 €. Two more square metres and two more fittings, for less than the screen costs.

Standard finishes, layout unchanged
Selected materials, possible re-planning
Premium materials and interior design
Indicative prices · VAT not included · not a binding offer. Your exact figure comes from the free site visit, fixed and itemised.
6 m² is the domestic border between “the house bathroom” and “the couple’s bathroom”. On plan they usually measure about 2.00 × 3.00 m, appear in four-bedroom flats and in seventies houses, and almost always arrive with a bidet, a 170 bath and a pedestal basin.
The brief priced above is the one asked for in that format: toilet and bidet, a double-basin vanity unit, and a shower or bath depending on how the home is used. It is the first size where two people can be inside without getting in each other’s way, and that — not the floor area — is what people buy.
The interesting thing is the price of that comfort. The second basin and its tap add up to 211 € at functional over a simple unit. Put another way: going from a 4 m² bathroom with one basin to a 6 m² one with two costs 338 € in total, equipment included. It is one of the cheapest quality-of-life upgrades there is.

Table anchored on the real project price of “complete bathroom renovation” in our price table, with tiling, flooring and waterproofing recalculated for 6 m² and the equipment that goes with this size: toilet and bidet, and a double-basin vanity unit. The last row holds everything that on-site price covers without being itemised: demolition, building work, fitting and the trades’ day rates. Excluding VAT; not a binding offer.
| Item | Functional | Mid-range | High spec | % of total |
|---|---|---|---|---|
| Tiling (~25 m²) | 575 € | 750 € | 1,450 € | 5% |
| Porcelain flooring | 162 € | 240 € | 438 € | 2% |
| Waterproofing · wet area | 224 € | 688 € | 768 € | 4% |
| Shower tray and screen | 403 € | 509 € | 611 € | 3% |
| Toilet and bidet | 108 € | 215 € | 477 € | 1% |
| Vanity unit with double basin | 422 € | 578 € | 916 € | 4% |
| Plumbing (5 points + drains) | 1,474 € | 1,994 € | 2,756 € | 12% |
| Electrics and ventilation · with certificate (CIE) | 396 € | 502 € | 765 € | 3% |
| Demolition, building work, fitting and labour · included in the real on-site price | 6,660 € | 10,509 € | 12,664 € | 66% |
| Total for the example budget | 10,424 € | 15,985 € | 20,845 € | |
| Equivalent per m² | 1,737 €/m² | 2,664 €/m² | 3,474 €/m² |
Compare this page with the 4 m² one and you will see the whole thesis in a line. There, 4 m², one basin and no bidet, and the functional total is 10,086 €. Here there are 6 m², two basins and a bidet, and the total is 10,424 €. The difference is 338 €: 3.4%.
The reason is in the split: the items that do not move with floor area take 9,687 € of the 10,424 € — 93% — and within them the five plumbing points and the labour are practically identical in the two bathrooms. What grows is 8 m² more tiling and 2 m² more flooring: 238 €. On top of that comes 211 € for the second basin, which you decide whether you want. (Together they add up to more than the total difference between the two bathrooms, because the labour row is itemised slightly lower at this size.)
The practical conclusion for anyone choosing a flat or deciding whether to knock down a partition: the big bathroom is not the budget’s problem. If you are torn between leaving the bathroom at 4 m² or taking two from the corridor, the cost of the bathroom hardly notices. What does notice is the partition work and the redistribution of the rest of the home, which is another item and another conversation.

The double basin is the classic reason for wanting a 6 m² bathroom. It is also a decision that often gets made badly, because it is made by looking at catalogues instead of looking at the wall. Here is what we know from fitting them.
The cost first, because it is the easy part: in our price table, the double-basin vanity unit with its two taps comes to 422 € at functional against the 211 € of the simple unit. The second drain comes inside the plumbing item at no extra charge. That is, 211 € for the second basin — less than the screen and much less than the tiling.
The difficult part is the linear metre. Two comfortable basins need a vanity unit of 120 cm at least, and below 100 the taps end up so close that nobody uses both at once, which was exactly the reason for fitting them. In a 6 m² bathroom that means giving a whole wall to the basins, and that wall is the same one you wanted for a tall unit or the washing machine.
Our question on the visit is always the same, and it throws people: do you want two taps, or do you want somewhere to put things? Often a request for a double basin is really a worktop problem. One basin with 60 cm free beside it solves that for half the money and leaves the next wall free. A real double basin is for people who leave the house at the same time as someone else, every day. These are figures from our own closed quotes; we work with them across the whole of Catalonia.
The bathroom is emptied and, before anything else, the worktop height and the spacing between basins are set out on the wall: at 6 m² that set-out conditions where mirror, sockets and wall lights go.
Five water points, the drains of the two bowls with their traps, the room’s electrical line and the points for a backlit mirror or wall lights. Watertightness test before closing.
Wet area waterproofed, 25 m² of tiling and 6 m² of flooring. The wall behind the basin is set out so that no joint falls on the tap.
Toilet and bidet, vanity unit with both basins, the two taps, screen, mirror and towel rail. Levelling the worktop, sealing, cleaning and the final walk-round.
2 weeks of work · confirmed on our Sabadell job — Two weeks, like the 4 and 5 m² ones: our 6 m² bathroom in Sabadell, with a corner bath and double basin, was handed over in 2 weeks. The double basin does not lengthen the programme — it is two bowls on the same unit and the same fitting day — but it does demand a proper set-out on day 1, because the position of the two basins decides where the mirror, sockets and wall lights fall. A late set-out does cost days here.
Permits: what renovating a 6 m² bathroom needs. The internal renovation of a bathroom is handled with a prior notification of works. The 6 m² nuance appears when those metres are gained by enlarging the bathroom at the expense of the corridor or a bedroom: moving a dividing partition is still minor work, but it changes the floor area of the rooms affected and is worth recording in the notification. If the partition turns out to be load-bearing, it becomes major works with a project. We verify it on the visit before quoting and the paperwork is its own line.
Not every cut has the same effect: these are the items where saving is sensible, and the ones where it ends up costing more.
La Rambla, Sabadell6 m²2 weeksReal projectA 6 m² bathroom with a corner bath and double basin in SabadellExactly 6 m²: this page’s reference jobA corner bath made for soakingDouble basin, the equipment that goes with this sizeBeige wave-pattern tiling with a floral motifIndicative costindicative · excluding VAT12,000–14,000 €
Carrer de Sants, Barcelona4 m²2 weeksReal projectA 4 m² bathroom in Sants, for comparisonTwo metres less and practically the same priceOne basin, no bidet and no bathBuilt-up shower with a glass screenThe most honest comparison we can show youIndicative costindicative · excluding VAT12,000–13,000 €The ones we are asked most before a quote is signed.
This page’s example budget, which already includes a bidet and double basin, comes to 10,424 € at a functional specification, 15,985 € at mid-range and 20,845 € for high specification, excluding VAT. Our real 6 m² bathroom in Sabadell, with a corner bath and double basin, was signed between 12,000 and 14,000 €. The final figure is fixed item by item after the free technical visit.
In our price table, the double-basin vanity unit with its two taps costs 422 € at functional against 211 € for the single-bowl unit: a 211 € difference. On top of that comes the second drain with its trap, which sits within the plumbing item and is not charged separately. What really decides whether it is worth it is not the price but whether you would rather have two taps or 60 cm more of free worktop.
In terms of the bathroom’s cost, yes: 338 € at functional, extra equipment included. What you have to look at is the other thing — where those two metres come from. If they come from the corridor, it is partition work and painting; if from a bedroom, you are changing the layout of the flat and that has its own budget. The bathroom is almost never the brake.
At 6 m² both fit separately, but tightly. Our Sabadell job solved it with a corner bath with a screen over it, which is the classic formula for giving up neither. If there are small children the bath wins; if not, a 160 shower with a fixed screen leaves the room much clearer. In this page’s example budget the item is the same: 403 € at functional.
It always has to be checked. A 120 unit with a worktop, two bowls and whatever people end up storing in it carries a lot more than it looks, and on a plain hollow-brick partition chemical anchors are not enough. When needed, we line the wall with moisture-resistant plasterboard over reinforced framing along the fixing line. It sits within the building work, but we tell you beforehand.
No, all are excluding VAT. The rate that applies — 10% reduced or 21% — depends on it being for your private use, the age of the building and the materials not exceeding 40% of the total cost of the job. It is confirmed in writing in the quote.