Plumbing and underfloor heating in a penthouse
2026

Project details
- Property type
- Penthouse
- Year
- 2026
- Status
- In progress
- What we did
- New plumbing · Frames for wall-hung toilets · Underfloor heating · Zoned manifolds · Insulation under the roof
About this renovation
A penthouse in an old building at the services stage: new plumbing with frames for wall-hung toilets, zoned manifolds and underfloor heating under a timber-beamed roof.
A penthouse under a roof of timber beams, in an old building, is a challenge for any installer: little headroom at the edges, uneven walls and no usable services. On this job everything is redone from scratch.
The plumbing is new, with recessed manifolds and frames for wall-hung toilets in every bathroom, set out to level before anything is closed up. Heating is by underfloor circuits, with several manifolds with flow meters mounted on accessible boards and the pipes laid over insulating panel.
Reflective insulation was fitted between the beams under the roof. The photos are from the services stage: when the penthouse is finished, we will show it in full.
















