Completed

Luxury renovation with white marble and brushed brass

2026

Main bathroom in veined marble with a double basin, a walnut unit and a freestanding bath

Project details

Property type
Flat
Year
2026
Status
Completed
What we did
Main bathroom in marble with a freestanding bath · Built-in showers with a bench and linear drain · Recessed taps in brushed brass · Bathroom furniture in walnut and oak · Marble headboard in the main bedroom · Chequerboard wood floor

About this renovation

A flat done in veined white marble and brushed brass: a main bathroom with a freestanding bath and double basin, four distinct bathrooms and a bedroom with a stone headboard.

The brief had a clear idea: the bathrooms were to be the best thing in the home. The main one was clad in white marble with a grey vein from floor to ceiling, the pieces matched so that the vein runs from one panel to the next, and it was organised in three zones — a continuous worktop with a double basin over a walnut chest of drawers, a freestanding bath in its own niche and a built-in shower behind glass with a ceiling rain head, side jets and a marble bench.

All the taps are recessed and in brushed brass, a finish that ages with dignity and does not ask for polishing. In the shower, white hexagonal mosaic so the floor grips, with a linear drain; in the dry zone, polished marble. The shower and the toilet each have their own glazed cubicle.

The other bathrooms do not copy the main one, they accompany it: one in marble with a brass surround and a faceted mirror, another in sage green with white gresite, a built-in bath and black taps, and a third in pink with a bath and a black screen. In the main bedroom, a wall-to-wall black-and-gold marble headboard is the one-off piece.

A luxury renovation measured by what does not appear in the photo: exact shower falls, stone pieces set out before cutting and recessed taps with access. That is why it stands up to daily use without losing the look of day one.

✆ Call✦ WhatsAppGet a quote →